SR 26 To Close In June For Culvert Replacement

A heads-up on a highway closing in Grant County: Contractors plan to close State Road 26 to replace a drainage culvert channeling Winslow Ditch under the highway. The 25-day road closure is scheduled to begin on or after June 1, and the highway is expected to be open to traffic by the end of the month.

Previous Post
SR 9 Construction To Switch Lanes
Next Post
Verizon Adding Temporary Towers To IMS

Search this site

Woof Boom Radio

WLBC (104.1 FM, and WLBC HD1), Muncie
WERK (104.9 FM), Muncie
WMUN (92.5 FM, 1340 AM), Muncie
WHBU (101.1 FM & 1240 AM), Anderson
WMXQ (93.5 FM), Hartford City
WBKQ (96.7 FM & 102.9 FM
& WLBC HD2), Alexandria / Muncie

WLBC
WMUN
Blake FM
WERK
MAX Rocks
MuncieJournal
765 Business Journal
WHBU
Woof Boom